top of page

Model 96-250-C PEMCO Mast

HEIGHT: 96 feet clear height, double tubing, triple rods

RATING: Maximum rated static hook load

  220,000 pounds with 4 lines strung

  250,000 pounds with 6 lines strung

  265,000 pounds with 8 lines strung

COLUMN LEGS: 3" x 6" x 1/4" wall Hi-tensile tubing

BRACES: 1 1/2" x 3" x 1/8" wall Hi-tensile tubing 

BASE SECTION: 4-Leg Model (2 legs to ground, 2 legs to rear of rig)

 Turnbuckle tilting with 3 1/2" screws in legs to ground 

TUBING BOARD: Capacity 27,000 feet 2 7/8" tubing 

  Fingers for end racking & adjustable for any size tubing

  Mounts at 55 feet above ground level

HYDRAULICS: Scoping ram & push-pull raising ram - chrome plated

  Controls for raising, lowering & scoping derrick 

  Operates off rig hydraulic system

ROD BOARD: 2-No. 104 Rod hangers with combined capacity of 208 stands of 3/4" rods.  With adapter         sleeves furnished will handle 5/8", 3/4", 7/8" & 1" sucker rods.

  Includes rodman basket, air cylinder transfer system and safety sub-elevators.

  Rod equipment goes into position when derrick is scoped up or down.

 Mounted at 78 feet for triple rods

CROWN:For 4, 6 or 8 line string up of conventional block flat with derrick 

  1-30" & 5-24" Timken bearing sheaves-hardened grooves

  1-30" & 1-24" Single sheaves in line

  1-24" Triple sheave cross-mounted

  1-24" Sandline sheave

  2-Catline sheaves

DERRICK LOCKS: Top section of derrick locks to bottom section when four load pins extend activated by two springs. Load pins are released manually with lever at operator's position when telescoping up or down.

WIRE ROPE: 2-Load guys with tail chain & tightening binder

PRIMER COAT: Briner Inorganic Zinc

TOP COAT: Dupont Imron or PPG Del Fleet

WEIGHT: 18,300# est.

Copyright © 2019 PEMCO Equipment, Inc. All Rights Reserved.

Phone: 432-366-2895

Quality Worldwide

Since 1962

bottom of page