DESIGN CRITERIA: Specifications set forth by the American Institute of Steel Construction (AISC) are utilized as a minimum.
WELDING CODE: Specifications set forth by the American Welding Society (AWS) D1.1. are utilized.
QUALITY CRITERIA: Specifications set forth by the American Institute of Steel Construction (AISC) are utilized.
INSPECTION: During the manufacture of each PEMCO mast, continual inspections occur.
Each inspection is performed by a minimum of four of the following:
- 
Engineering Department Quality Control Inspector 
- 
Sales Independent Inspector 
- 
Fabrication Foreman Plant Supervisor 
- 
Paint Shop Foreman 
PEMCO FABRICATION INSPECTIONS:
Mast Record Sheets
- 
Correct production drawings 
- 
Correct grade, quality of material 
- 
Record mill test reports & heat numbers of material 
Mast Shop Check List:
- 
Check dimensions per drawings 
- 
Square is 90° & Straight is 1/8” over 100 feet 
- 
Saw cut material, 90% of the mast is assembled with saw cut material to assure proper fit 
- 
Gauge of each section 
Mast Check List:
- 
Items as per Record Sheet 
- 
Hydraulic System 
- 
Latch Mechanism 
- 
Stabilizer – Scope Cylinder 
- 
Tubing Board 
- 
Rod Board 
- 
Crown – Sheaves 
- 
Base 
- 
Paint 
- 
Miscellaneous 
Independent Inspection:
- 
X-Ray – ASME VIII main leg splices 
- 
Magnetic Particle Inspection 
Paint Work:
- 
All pieces are sand blasted to SP-10 
- 
All pieces are primed with a zinc rich epoxy – ester primer (standard) or as specified by customer 
- 
All pieces are top coated with Dupont Imron, PPG Del Fleet or as specified by customer 
- 
Inspection of each coating is performed via mill gauge and visual 
Final Assembly:
- 
All components are assembled 
- 
All bearings and friction areas greased 
- 
Wire rope installed (Bridon American) 
- 
Paint touch up 
- 
Check list performed 
Records:
- 
File kept per serial number 
- 
Customer and Purchase Order 
- 
Mast Record Sheet 
- 
Independent Inspections 
- 
Materials Record 
- 
List of Workmen 
- 
Notes (Order & Fabrication Changes, Shipping) 
- 
Installation item list 
- 
Photographic Record 
Material Storage:
- 
All materials are stored indoors